Soo Locks open despite harsh winter weather conditions and ice
The locks underwent critical repairs and maintenance during the winter shutdown. Crews have battled the elements to put the Poe Lock back into operation at the scheduled time. The locks and Soo Locks crew will be available for service despite extremely heavy ice on the St. Marys River that has delayed the arrival of the first Cargo Vessel. Note: photos of the crews during winter work are available on our Facebook page: https://www.facebook.com/pages/Detroit-District-US-Army-Corps-of-Engineers/144354390916

Download Image: Full Size (0.09 MB)
Tags:
Photo by:  |  VIRIN: 140328-A-CE999-701.JPG