Grand Haven South Pier
Crews work on removing Grand Haven south pier’s concrete cap. Approximately 100 feet of concrete cap has been removed to date, work has been halted for the season due to weather and will resume in the spring. (U.S. Army Photo)

Download Image: Full Size (0.18 MB)
Tags:
Photo by: U.S. Army Photo |  VIRIN: 161130-A-XX000-002.JPG