Excavation underway
Contractors excavate fill material between the Poe and Davis Locks in preparation for the construction of a new compressed air building and upgrades of the air lines used to keep the locks free of ice.

Download Image: Full Size (3.18 MB)
Tags: Soo Locks
Photo by: U.S. Army Corps of Engineers |  VIRIN: 130506-A-YU979-926.JPG