Preparing a tug for repairs
Among many winter tasks this year is the replacement of parts of the hull of the 65-foot-long tug Owen M. Frederick. In preparation for this work on Dec. 13, 2012 she was lifted from the water and placed on the barge Huron by the Gatelifter Paul Bunyan.

Download Image: Full Size (1.68 MB)
Tags: Soo Locks
Photo by: 121213-A-YU979-403 |  VIRIN: 121213-A-YU979-403.JPG