Home > Media > Images

Image Gallery

Next Last
Boardman Dam Powerhouse
Boardman Dam Powerhouse
2/23/2017 3:24:00 PM
Grand Haven south pier construction underway approximately 100 feet of concrete cap has been removed to date, work has been halted for the season due to weather and will resume in the spring. (U.S. Army Photo)
South Pier
11/30/2016 7:49:00 AM
Crews work on removing Grand Haven south pier’s concrete cap. Approximately 100 feet of concrete cap has been removed to date, work has been halted for the season due to weather and will resume in the spring. (U.S. Army Photo)
Grand Haven South Pier
11/30/2016 7:49:00 AM
Contractors from Vazquez Commercial Contracting, LLC. work on Grand Haven south pier’s concrete cap. Work has been halted for the season due to weather and will resume in the spring. (U.S. Army Photo)
Grand Haven South Pier
11/30/2016 7:49:00 AM
The U.S. Army Corps of Engineers (USACE), Detroit District has awarded a $928,625 contract to RBV Contracting, Inc. of Detroit, MI to stabilize a portion of the north bank of the Red Run drain in Macomb County, MI.
Contract awarded for Red Run
10/3/2016 3:51:00 PM
Frankenmuth Construction
Frankenmuth Construction
2/1/2016 8:14:00 AM
An aerial view of the Cat Island Restoration Project in Green Bay, Wis.
Cat Island Project
8/29/2013 2:04:00 PM
Contractors working on the Cat Island Restoration Project in Green Bay, Wis. excavate a trench for the reinforced concrete pipe, RCP, (culvert) for water flow between the islands.
Trench excavation at Cat Island
8/29/2013 2:00:00 PM
Next Last